Six trades under one licensed B general contractor. Here's what each one covers, what's included and where the extra costs usually hide, so you know what you're asking for before we even show up.
Most of our residential jobs start with a room that stopped working years ago. The kitchen with one outlet on the counter, the hall bath with the cracked tub. We tear it out, rebuild it and hand it back finished with the permit signed off.
Some jobs need stamped drawings from an architect or engineer, especially additions and ADUs. We'll tell you at the estimate if yours does. Appliances and fixtures you pick out are priced separately from the build.
Commercial work runs on a lease date. Rent starts whether the space is ready or not, so we build the schedule backward from your opening day and tell you the moment something threatens it.
Kitchen hoods, fire sprinklers and other specialty systems go to specialty licensed trades. Your landlord's work letter also decides what's on you and what's on them, so bring it to the walkthrough if you have it.
Bakersfield summers don't leave room for a weak AC. We size the system to the house or suite instead of guessing off square footage, then install it, repair it and keep it running.
Brand and efficiency rating swing the price a lot, so your estimate lists the exact equipment instead of a range. If the electrical panel can't handle the new unit, that upgrade is quoted separately.
A lot of Bakersfield houses weren't wired for an EV charger, an induction range and a window unit in every bedroom. We upgrade the panel, run what the house needs and get it inspected.
If a panel upgrade needs a bigger service from the utility, PG&E's schedule sets that part of the timeline, not ours. We handle the paperwork and keep you posted while we wait.
Finish work is what you look at every day, so it's where sloppy shows. Floors that lie flat, tile lines that stay straight across the room and paint that stops exactly where it should.
Subfloor damage only shows up once the old floor comes up. If we find rot or a soft spot, we stop, show you and quote the repair before touching it.
Our welding side covers two kinds of steel: the kind that holds a building up and the kind people actually look at, like a driveway gate that finally swings without dragging.
Structural steel tied to a building permit usually needs an engineer's drawings. If you don't have them yet, we'll tell you what the inspector will ask for.
Most projects need more than one trade. These usually come along as part of a bigger job, so you're not hiring a separate crew for each one.
Yes, and most do. A kitchen remodel often needs new circuits, new lighting and new flooring. It all goes on one estimate and one schedule, with one person you call about it.
Usually not for a single kitchen or bathroom. Whole-home renovations sometimes run in phases so you can stay. We'll talk through what living there during the work actually looks like at the estimate.
Sometimes. It depends on the layout and what the work involves. When it's possible, we phase the job so part of the space keeps running, and we'll be straight with you when it isn't.
Usually, yes. Tell us what you're planning before you order so we can confirm it fits the space and meets code. Any warranty on the product itself comes from the manufacturer.
A rough budget, the timeline you're hoping for and photos of anything you like. Plans or measurements help if you have them, but we'll take our own either way.